Error message

  • Deprecated function: Array and string offset access syntax with curly braces is deprecated in include_once() (line 20 of /home/cleanene/public_html/CMS/includes/file.phar.inc).
  • Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in include_once() (line 1387 of /home/cleanene/public_html/CMS/includes/bootstrap.inc).
  • Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in include_once() (line 1387 of /home/cleanene/public_html/CMS/includes/bootstrap.inc).
  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home/cleanene/public_html/CMS/includes/common.inc).

Project Summary

  • Flying Wind Turbine Powered Diamond Mine

    Location: Limpopo, South Africa
    GPEKS analyzed the feasibility of installing a small-scale wind farm to offset some of the power requirements of a diamond mine in South Africa. The wind resources at the mine site are very poor, so the use of flying wind turbines was determined to be the most viable option.
    Completion Date: 2008-06-18